{"id":1238,"date":"2026-10-14T15:39:00","date_gmt":"2026-10-14T15:39:00","guid":{"rendered":"https:\/\/www.fenxifiber.com\/800g-parallel-optics-fiber-count\/"},"modified":"2026-10-02T09:59:05","modified_gmt":"2026-10-02T09:59:05","slug":"800g-parallel-optics-fiber-count","status":"publish","type":"post","link":"https:\/\/www.fenxifiber.com\/ar\/800g-parallel-optics-fiber-count\/","title":{"rendered":"\u0627\u0644\u062a\u062e\u0637\u064a\u0637 \u0627\u0644\u0645\u062a\u0648\u0627\u0632\u064a \u0644\u0639\u062f\u062f \u0627\u0644\u0623\u0644\u064a\u0627\u0641 \u0627\u0644\u0628\u0635\u0631\u064a\u0629 \u0641\u064a \u0627\u0644\u0648\u0635\u0644\u0627\u062a \u0630\u0627\u062a \u0627\u0644\u0633\u0639\u0629 800G"},"content":{"rendered":"<p><strong>An 800G speed label does not define one fibre count. The optical module variant and lane architecture determine whether the link uses parallel multimode, parallel single-mode or duplex wavelength-based transmission. Start with the exact interface code and map fibres from equipment to equipment.<\/strong><\/p>\n<p>Procurement errors occur when a project orders trunks before optics are frozen. MPO row geometry, pin status, cassette conversion and future breakout plans can all change after the speed is agreed. A passive-layer plan should record the current interface and the approved alternatives, with a separate bill of materials for each.<\/p>\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/www.fenxifiber.com\/wp-content\/uploads\/2026\/09\/h2-spine-leaf-topology.jpg\" alt=\"Leaf-spine data center topology requiring 800G fiber-count planning\" width=\"1337\" height=\"861\" \/><\/figure>\n<h2>What Must Be Decided for 800G fiber count planning?<\/h2>\n<p>\u0627\u0633\u062a\u062e\u062f\u0645 \u062c\u062f\u0648\u0644 \u0627\u0644\u0642\u0631\u0627\u0631 \u0644\u062a\u062d\u0648\u064a\u0644 \u0627\u0644\u0645\u0648\u0636\u0648\u0639 \u0625\u0644\u0649 \u0645\u062f\u062e\u0644\u0627\u062a \u0645\u062d\u062f\u062f\u0629 \u062a\u062a\u0639\u0644\u0642 \u0628\u0627\u0644\u0634\u0631\u0627\u0621 \u0648\u0627\u0644\u062a\u0635\u0645\u064a\u0645 \u0648\u0627\u0644\u0642\u0628\u0648\u0644. \u064a\u062c\u0628 \u0627\u0644\u062a\u062d\u0642\u0642 \u0645\u0646 \u0643\u0644 \u0635\u0641 \u0648\u0641\u0642\u064b\u0627 \u0644\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0627\u0644\u0641\u0639\u0644\u064a\u0629 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0627\u0644\u0645\u0639\u062f\u0627\u062a \u0648\u0627\u0644\u0645\u0633\u0627\u0631 \u0648\u0627\u0644\u0648\u062c\u0647\u0629\u060c \u0628\u062f\u0644\u0627\u064b \u0645\u0646 \u0646\u0633\u062e\u0647 \u0645\u0646 \u0643\u062a\u0627\u0644\u0648\u062c \u0639\u0627\u0645.<\/p>\n<table>\n<thead>\n<tr>\n<th>\u0645\u062c\u0627\u0644 \u0627\u062a\u062e\u0627\u0630 \u0627\u0644\u0642\u0631\u0627\u0631<\/th>\n<th>\u0645\u0627 \u0627\u0644\u0630\u064a \u064a\u062c\u0628 \u062a\u062d\u062f\u064a\u062f\u0647<\/th>\n<th>\u0644\u0645\u0627\u0630\u0627 \u0647\u0630\u0627 \u0645\u0647\u0645\u061f<\/th>\n<th>\u0627\u0644\u0623\u062f\u0644\u0629 \u0627\u0644\u062a\u064a \u064a\u062c\u0628 \u0627\u0644\u0627\u062d\u062a\u0641\u0627\u0638 \u0628\u0647\u0627<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Optic variant<\/td>\n<td>Exact module and interface code<\/td>\n<td>Defines lanes and reach<\/td>\n<td>Approved equipment list<\/td>\n<\/tr>\n<tr>\n<td>Lane map<\/td>\n<td>Transmit and receive positions<\/td>\n<td>Defines fibre count and polarity<\/td>\n<td>\u062e\u0631\u064a\u0637\u0629 \u0634\u0627\u0645\u0644\u0629<\/td>\n<\/tr>\n<tr>\n<td>Connector geometry<\/td>\n<td>MPO rows, width, pins and key<\/td>\n<td>\u064a\u062a\u062d\u0642\u0642 \u0645\u0646 \u0627\u0644\u062a\u0648\u0627\u0641\u0642 \u0627\u0644\u0645\u0627\u062f\u064a<\/td>\n<td>IEC interface and drawing<\/td>\n<\/tr>\n<tr>\n<td>Patching model<\/td>\n<td>Direct, panel, cassette or harness<\/td>\n<td>Changes connections and loss<\/td>\n<td>Channel topology<\/td>\n<\/tr>\n<tr>\n<td>\u0627\u0644\u0647\u062c\u0631\u0629<\/td>\n<td>Named future optic variants<\/td>\n<td>Avoids speculative overbuild<\/td>\n<td>Alternative BOM and trigger<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>How to Control 800G fiber count planning in the Project<\/h2>\n<p>\u062a\u0631\u0628\u0637 \u0639\u0646\u0627\u0635\u0631 \u0627\u0644\u062a\u062d\u0643\u0645 \u0623\u062f\u0646\u0627\u0647 \u0628\u064a\u0646 \u0627\u0644\u0631\u0633\u0645\u060c \u0648\u0627\u0644\u0639\u064a\u0646\u0629\u060c \u0648\u062f\u0641\u0639\u0629 \u0627\u0644\u0625\u0646\u062a\u0627\u062c\u060c \u0648\u0627\u0644\u0646\u062a\u064a\u062c\u0629 \u0627\u0644\u0646\u0647\u0627\u0626\u064a\u0629. \u0648\u0642\u062f \u0635\u064f\u0645\u0645\u062a \u0647\u0630\u0647 \u0627\u0644\u0639\u0646\u0627\u0635\u0631 \u0644\u062a\u0643\u0648\u0646 \u0639\u0645\u0644\u064a\u0629 \u0628\u0634\u0643\u0644 \u0645\u062a\u0639\u0645\u062f: \u0641\u0643\u0644 \u0645\u0646\u0647\u0627 \u064a\u064f\u0646\u0634\u0626 \u0633\u062c\u0644\u0627\u064b \u064a\u0645\u0643\u0646 \u0644\u0641\u0631\u0642 \u0627\u0644\u0645\u0634\u062a\u0631\u064a\u0627\u062a \u0648\u0627\u0644\u0647\u0646\u062f\u0633\u0629 \u0648\u0627\u0644\u0639\u0645\u0644 \u0627\u0644\u0645\u064a\u062f\u0627\u0646\u064a \u0645\u0631\u0627\u062c\u0639\u062a\u0647 \u0644\u0627\u062d\u0642\u064b\u0627.<\/p>\n<h3>Freeze optics before trunks<\/h3>\n<p>Confirm the exact transceiver option on both ends. If procurement must start earlier, approve separate passive designs for each permitted optic rather than blending them into one assumption.<\/p>\n<h3>Map every lane<\/h3>\n<p>Show transmit, receive and unused positions through jumpers, trunks and modules. Include direction and viewing convention on connector-face diagrams.<\/p>\n<h3>Budget the chosen topology<\/h3>\n<p>Count all connections introduced by panels or cassettes and allocate acceptance margin to the complete channel. Direct and structured links should not share an unexplained loss limit.<\/p>\n<h3>Plan test access and spares<\/h3>\n<p>Confirm that test interfaces and reference cords support the selected MPO geometry. Stock the exact pin and key arrangement used by the approved channel.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.fenxifiber.com\/wp-content\/uploads\/2026\/02\/MPO-Connector.jpg\" alt=\"MPO connector used by parallel optical interfaces\" width=\"783\" height=\"783\" \/><\/figure>\n<h2>\u0641\u062d\u0648\u0635\u0627\u062a \u0627\u0644\u0642\u0628\u0648\u0644 \u0648\u0627\u0644\u062a\u0633\u0644\u064a\u0645<\/h2>\n<p>\u064a\u062c\u0628 \u0627\u0644\u0627\u062a\u0641\u0627\u0642 \u0639\u0644\u0649 \u0627\u0644\u0637\u0631\u064a\u0642\u0629 \u0648\u0627\u0644\u0625\u062c\u0631\u0627\u0621\u0627\u062a \u0642\u0628\u0644 \u0628\u062f\u0621 \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631. \u0641\u0645\u0646 \u0627\u0644\u0635\u0639\u0628 \u0627\u0644\u0627\u0633\u062a\u0641\u0627\u062f\u0629 \u0645\u0646 \u0623\u064a \u0646\u062a\u064a\u062c\u0629 \u0644\u0627 \u064a\u0648\u062c\u062f \u0644\u0647\u0627 \u0645\u0633\u0624\u0648\u0644 \u0645\u062d\u062f\u062f \u0639\u0646 \u0627\u0644\u0633\u062c\u0644 \u0623\u0648 \u0625\u062c\u0631\u0627\u0621 \u0645\u062d\u062f\u062f \u0641\u064a \u062d\u0627\u0644\u0629 \u0627\u0644\u0641\u0634\u0644\u060c \u0648\u0630\u0644\u0643 \u0623\u062b\u0646\u0627\u0621 \u0627\u0644\u0625\u0641\u0631\u0627\u062c \u0639\u0646 \u0627\u0644\u0634\u062d\u0646\u0629 \u0623\u0648 \u0628\u062f\u0621 \u0627\u0644\u062a\u0634\u063a\u064a\u0644.<\/p>\n<table>\n<thead>\n<tr>\n<th>\u062a\u062d\u0642\u0642<\/th>\n<th>\u0627\u0644\u0637\u0631\u064a\u0642\u0629<\/th>\n<th>\u0627\u0644\u0633\u062c\u0644<\/th>\n<th>\u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u0641\u0634\u0644<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Optics approval<\/td>\n<td>Verify module codes<\/td>\n<td>Signed equipment list<\/td>\n<td>Stop ambiguous order<\/td>\n<\/tr>\n<tr>\n<td>Lane map<\/td>\n<td>Review connector faces<\/td>\n<td>Controlled drawing<\/td>\n<td>Correct missing lanes<\/td>\n<\/tr>\n<tr>\n<td>Pilot channel<\/td>\n<td>Assemble full path<\/td>\n<td>Measured pilot<\/td>\n<td>Revise topology<\/td>\n<\/tr>\n<tr>\n<td>Per-fibre test<\/td>\n<td>Measure all active positions<\/td>\n<td>Result file<\/td>\n<td>Quarantine failed lane<\/td>\n<\/tr>\n<tr>\n<td>Spare audit<\/td>\n<td>Match pins, key and count<\/td>\n<td>Inventory record<\/td>\n<td>Procure correct spare<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.fenxifiber.com\/wp-content\/uploads\/2026\/09\/MPO-Adapter-Panel-Cassette-1U.jpg\" alt=\"MPO cassette panel considered in an 800G cabling architecture\" width=\"1536\" height=\"954\" \/><\/figure>\n<h2>\u0627\u0644\u0645\u0639\u0627\u064a\u064a\u0631 \u0648\u0627\u0644\u0623\u062f\u0644\u0629 \u0627\u0644\u062a\u064a \u064a\u062c\u0628 \u0627\u0644\u0627\u0633\u062a\u0646\u0627\u062f \u0625\u0644\u064a\u0647\u0627 \u0639\u0646\u062f \u0625\u0635\u062f\u0627\u0631 \u0623\u0645\u0631 \u0627\u0644\u0634\u0631\u0627\u0621<\/h2>\n<p>\u064a\u062a\u0646\u0627\u0648\u0644 \u0647\u0630\u0627 \u0627\u0644\u0645\u0646\u0634\u0648\u0631 \u0627\u0644\u0635\u0627\u062f\u0631 \u0639\u0646 \u0627\u0644\u0644\u062c\u0646\u0629 \u0627\u0644\u062f\u0648\u0644\u064a\u0629 \u0644\u0644\u0643\u0647\u0631\u0628\u0627\u0621 (IEC) \u0648\u0627\u062c\u0647\u0629 MPO \u0630\u0627\u062a \u0627\u0644\u0635\u0641\u064a\u0646 \u0648\u0639\u0631\u0636 16 \u0644\u064a\u0641\u064b\u0627. \u0627\u0646\u0638\u0631 <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/26692\" target=\"_blank\" rel=\"noopener\">\u0648\u0627\u062c\u0647\u0629 MPO \u0630\u0627\u062a \u0639\u0631\u0636 16 \u0644\u064a\u0641\u064b\u0627 \u0648\u0641\u0642\u064b\u0627 \u0644\u0644\u0645\u0639\u064a\u0627\u0631 IEC 61754-7-3<\/a>.<\/p>\n<p>\u064a\u062a\u0646\u0627\u0648\u0644 \u0647\u0630\u0627 \u0627\u0644\u0625\u062c\u0631\u0627\u0621 \u0627\u0644\u0635\u0627\u062f\u0631 \u0639\u0646 \u0627\u0644\u0644\u062c\u0646\u0629 \u0627\u0644\u062f\u0648\u0644\u064a\u0629 \u0644\u0644\u0643\u0647\u0631\u0628\u0627\u0621 (IEC) \u0627\u062e\u062a\u0628\u0627\u0631\u0627\u062a \u0627\u0644\u062a\u0648\u0647\u064a\u0646 \u0648\u0627\u0644\u0642\u0637\u0628\u064a\u0629 \u0648\u0627\u0644\u0637\u0648\u0644 \u0644\u0644\u0643\u0627\u0628\u0644\u0627\u062a \u0627\u0644\u0645\u0632\u0648\u062f\u0629 \u0628\u0646\u0647\u0627\u064a\u0627\u062a MPO \u0648\u0627\u0644\u0645\u0631\u0643\u0628\u0629 \u0628\u0627\u0644\u0641\u0639\u0644. \u0627\u0646\u0638\u0631 <a href=\"https:\/\/webstore.iec.ch\/en\/publication\/32021\" target=\"_blank\" rel=\"noopener\">\u0625\u062c\u0631\u0627\u0621 \u0627\u062e\u062a\u0628\u0627\u0631 \u0643\u0627\u0628\u0644\u0627\u062a MPO \u0648\u0641\u0642\u064b\u0627 \u0644\u0644\u0645\u0639\u064a\u0627\u0631 IEC 61280-4-5<\/a>.<\/p>\n<p>\u062a\u062d\u062f\u062f \u0646\u0633\u062e\u0629 \u0639\u0627\u0645 2024 \u0625\u062c\u0631\u0627\u0621\u0627\u062a \u0627\u0644\u0641\u062d\u0635 \u0648\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0627\u0644\u062e\u0627\u0635\u0629 \u0628\u0643\u0627\u0628\u0644\u0627\u062a \u0627\u0644\u0623\u0644\u064a\u0627\u0641 \u0627\u0644\u0636\u0648\u0626\u064a\u0629 \u0627\u0644\u0645\u0631\u0643\u0628\u0629. \u0627\u0646\u0638\u0631 <a href=\"https:\/\/committee.iso.org\/standard\/89632.html\" target=\"_blank\" rel=\"noopener\">ISO\/IEC 14763-3:2024 \u0627\u062e\u062a\u0628\u0627\u0631 \u0627\u0644\u0643\u0627\u0628\u0644\u0627\u062a \u0627\u0644\u0636\u0648\u0626\u064a\u0629<\/a>.<\/p>\n<h2>Planning summary<\/h2>\n<p>Plan 800G cabling from the exact optical interface outward. A documented lane map and alternate bill of materials are safer than assuming one MPO count will fit every 800G module.<\/p>\n<ul>\n<li>Approve exact optic variants<\/li>\n<li>Draw every lane<\/li>\n<li>Name MPO geometry and pins<\/li>\n<li>Test the complete pilot channel<\/li>\n<li>Stock matching spares<\/li>\n<\/ul>\n<p>\u0644\u0644\u062d\u0635\u0648\u0644 \u0639\u0644\u0649 \u0639\u0631\u0636 \u0623\u0633\u0639\u0627\u0631 \u062e\u0627\u0635 \u0628\u0645\u0634\u0631\u0648\u0639 \u0645\u0639\u064a\u0646\u060c \u064a\u0631\u062c\u0649 \u0627\u0644\u0627\u0637\u0644\u0627\u0639 \u0639\u0644\u0649 \u0645\u0648\u0642\u0639 Fenxi <a href=\"https:\/\/www.fenxifiber.com\/ar\/product-category\/%d8%b3%d9%84%d9%83-%d8%aa%d9%88%d8%b5%d9%8a%d9%84-%d8%a7%d9%84%d8%a3%d9%84%d9%8a%d8%a7%d9%81-%d8%a7%d9%84%d8%a8%d8%b5%d8%b1%d9%8a%d8%a9\/%d8%b3%d9%84%d9%83-%d8%aa%d9%88%d8%b5%d9%8a%d9%84-%d8%a7%d9%84%d8%a3%d9%84%d9%8a%d8%a7%d9%81-%d8%a7%d9%84%d8%a8%d8%b5%d8%b1%d9%8a%d8%a9-mpo-mtp\/\" target=\"_blank\" rel=\"noopener\">MPO\/MTP data center cabling<\/a>, <a href=\"https:\/\/www.fenxifiber.com\/ar\/product-category\/%d9%85%d9%88%d8%b5%d9%84-lc\/\" target=\"_blank\" rel=\"noopener\">\u0645\u062c\u0645\u0648\u0639\u0629 \u0645\u0648\u0635\u0644\u0627\u062a LC<\/a>, <a href=\"https:\/\/www.fenxifiber.com\/ar\/mpo-adapter-panel-selection\/\" target=\"_blank\" rel=\"noopener\">MPO adapter panel guide<\/a>, \u0648 <a href=\"https:\/\/www.fenxifiber.com\/ar\/800g-1-6t-fiber-cabling-migration\/\" target=\"_blank\" rel=\"noopener\">800G to 1.6T migration guide<\/a>. \u064a\u0631\u062c\u0649 \u0625\u0631\u0633\u0627\u0644 \u0645\u0639\u0644\u0648\u0645\u0627\u062a \u062d\u0648\u0644 \u0627\u0644\u0633\u0648\u0642 \u0627\u0644\u0645\u0633\u062a\u0647\u062f\u0641\u0629\u060c \u0648\u0648\u0627\u062c\u0647\u0627\u062a \u0627\u0644\u062a\u0648\u0635\u064a\u0644\u060c \u0648\u0646\u0648\u0639 \u0627\u0644\u0623\u0644\u064a\u0627\u0641\u060c \u0648\u062a\u0631\u0643\u064a\u0628 \u0627\u0644\u0643\u0627\u0628\u0644\u060c \u0648\u0627\u0644\u0643\u0645\u064a\u0627\u062a\u060c \u0648\u0631\u0642\u0645 \u0645\u0631\u0627\u062c\u0639\u0629 \u0627\u0644\u0645\u062e\u0637\u0637\u060c \u0648\u0633\u062c\u0644\u0627\u062a \u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631 \u0627\u0644\u0645\u0637\u0644\u0648\u0628\u0629. \u0648\u064a\u0645\u0643\u0646 \u0639\u0646\u062f\u0626\u0630\u064d \u0623\u0646 \u062a\u0645\u064a\u0632 \u0627\u0644\u0631\u062f \u0628\u064a\u0646 \u0627\u0644\u062e\u064a\u0627\u0631\u0627\u062a \u0627\u0644\u0642\u064a\u0627\u0633\u064a\u0629 \u0627\u0644\u0648\u0627\u0631\u062f\u0629 \u0641\u064a \u0627\u0644\u0643\u062a\u0627\u0644\u0648\u062c \u0648\u0627\u0644\u0628\u0646\u0648\u062f \u0627\u0644\u062a\u064a \u062a\u062d\u062a\u0627\u062c \u0625\u0644\u0649 \u062a\u0623\u0643\u064a\u062f \u0623\u0648 \u0623\u062f\u0648\u0627\u062a \u062a\u0635\u0646\u064a\u0639 \u0645\u062e\u0635\u0635\u0629.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u064a\u062d\u062f\u062f \u00ab\u062e\u0637\u0629 800G\u00bb \u0639\u062f\u062f \u0623\u0644\u064a\u0627\u0641 \u0627\u0644\u0628\u0635\u0631\u064a\u0627\u062a \u0627\u0644\u0645\u062a\u0648\u0627\u0632\u064a\u0629 \u0627\u0633\u062a\u0646\u0627\u062f\u064b\u0627 \u0625\u0644\u0649 \u0648\u0627\u062c\u0647\u0627\u062a \u0623\u062c\u0647\u0632\u0629 \u0627\u0644\u0625\u0631\u0633\u0627\u0644 \u0648\u0627\u0644\u0627\u0633\u062a\u0642\u0628\u0627\u0644 \u0627\u0644\u062f\u0642\u064a\u0642\u0629\u060c \u0648\u062e\u0631\u0627\u0626\u0637 \u0627\u0644\u0645\u0633\u0627\u0631\u0627\u062a\u060c \u0648\u0647\u0646\u062f\u0633\u0629 MPO\u060c \u0648\u0637\u0631\u064a\u0642\u0629 \u0627\u0644\u062a\u0648\u0635\u064a\u0644\u060c \u0648\u0627\u0644\u0627\u062e\u062a\u0628\u0627\u0631\u060c \u0648\u0642\u0637\u0639 \u0627\u0644\u063a\u064a\u0627\u0631\u060c \u0648\u0627\u0644\u062a\u0631\u062d\u064a\u0644 \u0627\u0644\u0645\u0633\u062a\u0642\u0628\u0644\u064a.<\/p>","protected":false},"author":1,"featured_media":1135,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1238","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/posts\/1238","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/comments?post=1238"}],"version-history":[{"count":1,"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/posts\/1238\/revisions"}],"predecessor-version":[{"id":1239,"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/posts\/1238\/revisions\/1239"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/media\/1135"}],"wp:attachment":[{"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/media?parent=1238"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/categories?post=1238"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fenxifiber.com\/ar\/wp-json\/wp\/v2\/tags?post=1238"}],"curies":[{"name":"\u062f\u0628\u0644\u064a\u0648 \u0628\u064a","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}