{"id":1246,"date":"2026-10-16T09:02:00","date_gmt":"2026-10-16T09:02:00","guid":{"rendered":"https:\/\/www.fenxifiber.com\/plc-splitter-lot-acceptance\/"},"modified":"2026-10-02T10:00:48","modified_gmt":"2026-10-02T10:00:48","slug":"plc-splitter-lot-acceptance","status":"publish","type":"post","link":"https:\/\/www.fenxifiber.com\/es\/plc-splitter-lot-acceptance\/","title":{"rendered":"PLC Splitter Uniformity Directivity and PDL in Lot Acceptance"},"content":{"rendered":"<p><strong>Uniformity, directivity and polarization-dependent loss describe different behaviours and must not be replaced by a single insertion-loss value. Lot acceptance should define the method, wavelengths, sample plan and disposition rule before shipment.<\/strong><\/p>\n<p>Uniformity compares output-port loss spread; directivity concerns unwanted coupling in the reverse direction; PDL describes loss variation with polarization. Values depend on the stated configuration and method. Buyers should request raw port-level data and a product-specific specification rather than transferring limits from an unrelated package or split ratio.<\/p>\n<figure class=\"wp-block-image size-large\"><img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/www.fenxifiber.com\/wp-content\/uploads\/2026\/09\/h2-plc-waveguide-chip.jpg\" alt=\"Planar lightwave splitter chip whose outputs require port-level testing\" width=\"1337\" height=\"861\" \/><\/figure>\n<h2>What Must Be Decided for PLC splitter uniformity directivity PDL?<\/h2>\n<p>Utiliza la tabla de decisiones para convertir el tema en datos controlados de compra, dise\u00f1o y aceptaci\u00f3n. Cada fila debe verificarse con respecto a las especificaciones reales del equipo, la ruta y el destino, en lugar de copiarse de un cat\u00e1logo gen\u00e9rico.<\/p>\n<table>\n<thead>\n<tr>\n<th>\u00c1rea de decisi\u00f3n<\/th>\n<th>Qu\u00e9 hay que especificar<\/th>\n<th>Por qu\u00e9 es importante<\/th>\n<th>Pruebas que deben conservarse<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Parameter definition<\/td>\n<td>Formula, direction and units<\/td>\n<td>Prevents inconsistent reports<\/td>\n<td>Controlled specification<\/td>\n<\/tr>\n<tr>\n<td>Longitudes de onda<\/td>\n<td>Exact test wavelengths and condition<\/td>\n<td>Results vary by wavelength<\/td>\n<td>Test plan<\/td>\n<\/tr>\n<tr>\n<td>Port coverage<\/td>\n<td>Every output or approved sample<\/td>\n<td>Finds weak channels<\/td>\n<td>Raw port data<\/td>\n<\/tr>\n<tr>\n<td>Muestreo<\/td>\n<td>Lot, level and switching rule<\/td>\n<td>Controls inspection risk<\/td>\n<td>Sampling instruction<\/td>\n<\/tr>\n<tr>\n<td>Traceability<\/td>\n<td>Device, lot, instrument and date<\/td>\n<td>Supports investigations<\/td>\n<td>Serialized record<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>How to Control PLC splitter uniformity directivity PDL in the Project<\/h2>\n<p>Los controles que se muestran a continuaci\u00f3n vinculan el plano, la muestra, el lote de producci\u00f3n y el resultado de la instalaci\u00f3n. Se han dise\u00f1ado deliberadamente para ser pr\u00e1cticos: cada uno genera un registro que los equipos de compras, ingenier\u00eda y de campo pueden revisar posteriormente.<\/p>\n<h3>Keep parameters separate<\/h3>\n<p>Report insertion loss by port, calculate uniformity from the defined set, and record directivity and PDL under their specified methods. A pass label without the underlying fields is not auditable.<\/p>\n<h3>Freeze methods before results<\/h3>\n<p>Agree wavelengths, launch, connectors, reference procedure and environmental condition in the purchase specification. Do not change a method after viewing a difficult lot.<\/p>\n<h3>Use a declared sampling plan<\/h3>\n<p>Choose the sample size and acceptance rule from the relevant inspection system and contract. AQL is a process for lot disposition, not a promise that every untested unit meets the limit.<\/p>\n<h3>Investigate patterns<\/h3>\n<p>Look for repeated weak port positions, package lots or connector types. Pattern review can find assembly or mapping problems that a simple pass count misses.<\/p>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.fenxifiber.com\/wp-content\/uploads\/2026\/01\/Optical-Splitter-SC-APC-2.jpg\" alt=\"Connectorized PLC splitter prepared for optical acceptance\" width=\"800\" height=\"800\" \/><\/figure>\n<h2>Verificaciones de aceptaci\u00f3n y entrega<\/h2>\n<p>Acuerden el m\u00e9todo y el procedimiento antes de que comience la prueba. Un resultado sin un responsable definido del registro o sin una acci\u00f3n en caso de falla resulta dif\u00edcil de utilizar durante la autorizaci\u00f3n de env\u00edo o la puesta en servicio.<\/p>\n<table>\n<thead>\n<tr>\n<th>Verificar<\/th>\n<th>M\u00e9todo<\/th>\n<th>R\u00e9cord<\/th>\n<th>Acci\u00f3n en caso de falla<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>M\u00e9todo<\/td>\n<td>Compare procedure to specification<\/td>\n<td>Signed setup<\/td>\n<td>Retest with correct method<\/td>\n<\/tr>\n<tr>\n<td>Port data<\/td>\n<td>Review every required channel<\/td>\n<td>Raw table<\/td>\n<td>Quarantine missing data<\/td>\n<\/tr>\n<tr>\n<td>Calculations<\/td>\n<td>Recalculate uniformity and summaries<\/td>\n<td>QA worksheet<\/td>\n<td>Correct report<\/td>\n<\/tr>\n<tr>\n<td>Muestreo<\/td>\n<td>Verify lot and sample identities<\/td>\n<td>Sampling record<\/td>\n<td>Resample only by rule<\/td>\n<\/tr>\n<tr>\n<td>Disposition<\/td>\n<td>Record accept, reject or concession<\/td>\n<td>Decision log<\/td>\n<td>Contain rejected lot<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/www.fenxifiber.com\/wp-content\/uploads\/2026\/09\/h2-package-styles.jpg\" alt=\"PLC splitter package formats linked to lot traceability\" width=\"1337\" height=\"861\" \/><\/figure>\n<h2>Normas y pruebas que respaldan la orden de compra<\/h2>\n<p>Corning enumera los formatos de componentes, m\u00f3dulos y bastidores, e indica que su gama de divisores PLC cumple con la certificaci\u00f3n GR-1209\/1221. V\u00e9ase <a href=\"https:\/\/www.corning.com\/oem-solutions\/worldwide\/en\/home\/products-solutions\/optical-communication-components\/taps-couplers-splitters\/plc-splitters.html\" target=\"_blank\" rel=\"noopener\">Referencia de calificaci\u00f3n del divisor de Corning PLC<\/a>.<\/p>\n<p>The 2026 edition defines AQL-indexed lot-by-lot attribute-sampling schemes and switching rules. See <a href=\"https:\/\/www.iso.org\/standard\/2859-1\" target=\"_blank\" rel=\"noopener\">ISO 2859-1:2026 AQL sampling standard<\/a>.<\/p>\n<p>ISO 28590 gives guidance on selecting an inspection system from the ISO 2859 family. See <a href=\"https:\/\/www.iso.org\/standard\/64622.html\" target=\"_blank\" rel=\"noopener\">ISO 28590 acceptance-sampling overview<\/a>.<\/p>\n<h2>Acceptance checklist<\/h2>\n<p>A useful splitter certificate connects defined parameters to raw port data, equipment, sample identity and a pre-agreed lot decision. Keep all of those records under the same part revision.<\/p>\n<ul>\n<li>Define each parameter<\/li>\n<li>Name wavelengths and method<\/li>\n<li>Retain port-level results<\/li>\n<li>Use a declared sample plan<\/li>\n<li>Control retest and concession decisions<\/li>\n<\/ul>\n<p>Para obtener una cotizaci\u00f3n espec\u00edfica para tu proyecto, consulta la p\u00e1gina de Fenxi <a href=\"https:\/\/www.fenxifiber.com\/es\/product-category\/divisor-de-fibra-optica\/\" target=\"_blank\" rel=\"noopener\">Gama de divisores de fibra \u00f3ptica<\/a>, <a href=\"https:\/\/www.fenxifiber.com\/es\/product\/divisor-de-fibra-optica-sc-apc-116-divisor-de-fibra-plc-de-baja-perdida\/\" target=\"_blank\" rel=\"noopener\">Divisor 1\u00d716 SC APC PLC<\/a>, <a href=\"https:\/\/www.fenxifiber.com\/es\/plc-vs-fbt-splitter\/\" target=\"_blank\" rel=\"noopener\">Comparaci\u00f3n entre el PLC y el divisor FBT<\/a>, y <a href=\"https:\/\/www.fenxifiber.com\/es\/pon-power-budget-split-ratio\/\" target=\"_blank\" rel=\"noopener\">Gu\u00eda para la planificaci\u00f3n del presupuesto de potencia en redes PON<\/a>. Env\u00eda el mercado de destino, las interfaces de conexi\u00f3n, el tipo de fibra, la estructura del cable, las cantidades, la revisi\u00f3n del plano y los registros de pruebas requeridos. De esta manera, la respuesta podr\u00e1 distinguir entre las opciones est\u00e1ndar del cat\u00e1logo y los art\u00edculos que requieran confirmaci\u00f3n o herramientas personalizadas.<\/p>","protected":false},"excerpt":{"rendered":"<p>Define PLC splitter uniformity, directivity, and PDL for lot acceptance with agreed methods, wavelengths, port-level data, sampling, retest rules, and traceability.<\/p>","protected":false},"author":1,"featured_media":1130,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1246","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/posts\/1246","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/comments?post=1246"}],"version-history":[{"count":1,"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/posts\/1246\/revisions"}],"predecessor-version":[{"id":1247,"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/posts\/1246\/revisions\/1247"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/media\/1130"}],"wp:attachment":[{"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/media?parent=1246"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/categories?post=1246"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fenxifiber.com\/es\/wp-json\/wp\/v2\/tags?post=1246"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}